Pink, Red, Gold — what each one is actually for
Earliest formal review. Read for strategy, win themes, and compliance against Section L. The proposal does not need to be polished — it needs to be on the right track.
Mid-stage review. Read for evaluator response: would a Section M evaluator score this favorably? Bring people who can simulate the evaluator’s perspective.
Final review. Compliance, polish, and the “does this go out the door” sign-off. Catch the page-limit and font-size issues that get a proposal thrown out before evaluation.
SourceDeck takes the structure on this page and applies it to a specific opportunity in your pipeline. Output: deck, matrix, capture plan, draft.
Analyze one opportunity →